Hi William,
Thanks for the inputs. The problem is we have limited switches on Ops Center Analyzer (single infra), whereas we have integrated all switches in SANnav (multi projects). I have to use SANnav API I doubt, but not sure how this works with ITOM scanning. Never done before and any leads is appreciated