Hitachi Ops Center​

 View Only
Expand all | Collapse all

Configuración de GAD

This thread has been viewed 32 times
  • 1.  Configuración de GAD

    Posted 03-14-2024 13:21
    Hello everyone,
     
    Can someone guide me on how to configure GAD.
     
    I have 2 VSP E590 with the following characteristics:
    • 8 FC ports
    • 4 base-t ports 10GB
     
    I have a cluster in VMWARE where 1 VM was deployed to comply with the Quorum function and ISCSI ports were used.
     
    In the quorum, a volume is already configured and presented to the VSPs.
     
    From here is it configuration from Ops Administrator or is there any other configuration to do?
     
    If you have any guide to carrying out a GAD, I would appreciate it.
    Regards,


    ------------------------------
    Javier Alejandro Camargo Soto
    IT Support Manager
    Dima Ltda.
    ------------------------------


  • 2.  RE: Configuración de GAD

    Posted 03-15-2024 09:11

    Hello Javier

    At a high level these are the steps you need to follow:

    Have a look at this video, it should be the same for your E590:

    https://knowledge.hitachivantara.com/Documents/Management_Software/Ops_Center/Administrator/10.9.x/Video_Tutorials/Setting_Up_and_Provisioning_for_High_Availability_in_Hitachi_Ops_Center_Administrator_for_Midrange-Storage_Systems_(E990)

    If you have questions feel free to revert back here. Regards

    William



    ------------------------------
    William Jansen Van Nieuwenhuizen
    Hitachi Vantara
    ------------------------------



  • 3.  RE: Configuración de GAD

    Posted 03-21-2024 03:50

    Hello Javier,

    To configure GAD on VSP systems, you need 5 ports on each storage

    MCU --> 1 port

    RCU --> 1 port

    Quorum --> 1 port

    CMD --> 1 port

    PVol --> 1 port ( since this port/HG will reside in a VSM)

    Since you already have Quorum volume presented to the GAD (Primary and Secondary) storage, I'm assuming Remote Connections are in place.

    The next step will be as below and best done using Administrator.

    1. Add that disk presented for Quorum under Quorum disks. Ensure path groups is same for both the storages.
    2. Create VSM and add both the E590 to it.
    3. Reserve a few volumes, HG as per your requirement.
    4. Create new volumes (ensure selecting VSM instead of meta resource) and map them to the HG also belonging to the VSM.

    Next will be creating GAD pairs using Protector, giving you more flexibility and functionality.



    ------------------------------
    Karan Patani
    Hardware Test Engineer - Senior
    Hitachi Vantara
    ------------------------------