Hi,
I am testing Pentaho8 Schedules. I created 2 jobs to be executed every day and every our each. Somehow Schedule is not working properly due to the job that is scheduled to run every our is not working at all and the other one is getting a strange behavior.
If I run both jobs from Spoon, both works fine.
If I run both jobs using command line (kitchen.sh), both works fine.
how can I check the error?
Thanks in advance.
Finally, all is working fine:
Issues detected:
- Quartz DB was not installed propperly. Once installation was OK, Schedule worked fine too.