Hi Ingo,
When a power outage occured, the R800 starts a Backup of SM and CM.
When power is back and machine is restarted, a restore is done.
Therefor start takes longer than usual.
If the DKC is not ready, the SN can`t be startet.
Best regards
Toni
- whem
- it takes a while
- firmware issue
- Windows is outdated, you may install the matching patches
------------------------------
Antonius-Maria Schwefer
Systems Engineer
Schwefer Software & Storage
------------------------------
Original Message:
Sent: 01-08-2024 04:38
From: Ingo Husmann
Subject: VSP G1500: DKC don't get ready / unable to login SN
Hi all,
we had a power outage on a G1500 test system. The cache batteries have been completely drained. After the restart, the DKC does not reach the ready status on the OP panel.
The SVP services loke like this:
Login in Storage Navigator not possible:
In the SVP maintenance windows the DKC is without errors.
Any ideas what happened here and how to solve the issue?
Many thanks in advance.
------------------------------
Ingo Husmann
System Engineer
ITRIS GmbH
------------------------------