Search Options
Skip to main content (Press Enter).
Sign In
Skip auxiliary navigation (Press Enter).
Skip main navigation (Press Enter).
Toggle navigation
Search Options
Communities
General Discussion
My Communities
Explore All Communities
Products
Solutions
Services
Developers
Champions Corner
Customer Stories
Insights
Customer Advocacy Program
Badge Challenges
Resources
Resource Library
Hitachi University
Product Documentation
Product Downloads
Partners Portal
How To
Get Started
Earn Points and Badges
FAQs
Start a Discussion
Profile
My Contributions
List of Contributions
Profile
Antonius-Maria Schwefer
Schwefer Software & Storage
Contact Details
Schwefer Software & Storage
×
Enter Password
Enter Password
Confirm Password
Antonius-Maria Schwefer
Schwefer Software & Storage
Profile
Connections
Contacts
Contributions
Badges
List of Contributions
My Content
1 to 5 of 5 total
search criteria =
ALL
RE: Download PDL
Posted By
Antonius-Maria Schwefer
02-23-2024 05:21
Found In
Egroup:
Flash Storage
\
view thread
Hi Jörg, seems to be in TISC only. In Support Portal i couldn´t find it either. ------------------------------ Antonius-Maria Schwefer Systems Engineer Schwefer Software & Storage ------------------------------
RE: VSP G1500: DKC don't get ready / unable to login SN
Posted By
Antonius-Maria Schwefer
02-01-2024 03:29
Found In
Egroup:
Flash Storage
\
view thread
when the batteries are discharged, it takes 90 minutes to get 30% charged, which are necessary to start. ------------------------------ Antonius-Maria Schwefer Systems Engineer Schwefer Software & Storage ------------------------------
RE: VSP G1500: DKC don't get ready / unable to login SN
Posted By
Antonius-Maria Schwefer
02-01-2024 03:27
Found In
Egroup:
Flash Storage
\
view thread
Hi Ingo, When a power outage occured, the R800 starts a Backup of SM and CM. When power is back and machine is restarted, a restore is done. Therefor start takes longer than usual. If the DKC is not ready, the SN can`t be startet. Best regards Toni whem it takes a while firmware ...
RE: Deleting the last DP-volume from Pools or Deleting the last volume from Parity Group
Posted By
Antonius-Maria Schwefer
02-01-2024 03:17
Found In
Egroup:
Flash Storage
\
view thread
------------------------------ Antonius-Maria Schwefer Systems Engineer Schwefer Software & Storage ------------------------------
RE: VSP-Gx00 Configuration from Start
Posted By
Antonius-Maria Schwefer
01-31-2024 08:27
Found In
Community:
Flash Storage
\
view thread
Hi Sudhir, it depends on the machine type and the customers requirements: is it a 2U CBX (VSP G350, VSP E590, VSP E790)? Then it doesn`t matter from the perspective of redundnacy, whether you take 6D+2P, 12D+2P or 6D+2P. In case of the big controllers, it is possible to install Parity Groups fully ...
© Hitachi Vantara LLC 2023. All Rights Reserved.
Powered by Higher Logic